From 6,630 residents in 1960 to more than 58,000
Asphalt Paving in Lacey, WA
Decades of growth mean driveways of every age, and each one needs something different.
- Free on-site estimates
- Itemized written quote: base depth and asphalt thickness spelled out
- Paving scheduled around the South Sound wet season

A City That Kept Growing
Asphalt paving in Lacey covers a wide spread of ages. The city counted 6,630 residents in 1960, 31,226 in 2000 and 53,526 in the 2020 census, and the 2024 estimate passed 58,600. Lacey only incorporated on December 5, 1966, after voters approved it by about 200 votes, and much of today's city was built in the decades since. A single street can hold a 1970s driveway that has been patched for years next to a newer one that just needs sealing.
Older driveways: look under the surface
Driveways from the 1960s through the 1980s were often built on thin rock over native soil. After decades of South Sound winters, the base under them may be wet, rutted or simply worn out. Signs include alligator cracking, potholes that keep coming back, and low spots that hold water. Laying a fresh coat of asphalt over a failed base buys a year or two at most. We probe the base and tell you whether an overlay will hold or whether the driveway needs to come out.
Newer neighborhoods: protect what you have
Many Lacey homes are newer, especially in the northeast and around Hawks Prairie. For these, the best value is maintenance: seal cracks before winter, sealcoat every few years in dry weather, and keep needles and moss from building up in shaded areas. HOA communities sometimes set standards for driveway material or appearance, so check your CC&Rs before changing a driveway's size or surface.
Hawks Prairie and commercial lots
In the 1990s about 500 acres in the Hawks Prairie area were set aside for industrial use and filled with warehouses and distribution centers instead, including Target's 1.7 million-square-foot West Coast facility, which opened in 2003. Heavy trucks are hard on pavement. Truck aprons, dock approaches and turning areas need thicker asphalt and base than a typical lot, and they fail first when water gets under them. We repair, rebuild and overlay commercial lots and can phase work to keep docks open.
Working in the Lacey right-of-way
Lacey Municipal Code 12.16.010 requires a right-of-way access permit before anyone obstructs, excavates or builds in the city right-of-way, and lists curbs, sidewalks and culverts among the covered facilities. The city's right-of-way application includes driveway approaches by number and width, a traffic control plan, and a reminder to call 811 at least two working days before digging. If your project changes an approach, we raise it at the estimate and confirm current requirements with the city.
Call (360) 282-1547 or
for a free written estimate.What to Know in Lacey
- Young city, older roots. Lacey incorporated on December 5, 1966, after an earlier 1964 attempt failed. It was first called Woodland, after settlers Isaac and Catherine Wood, and renamed Lacey in 1891.
- Rapid growth. Lacey grew from 6,630 residents in 1960 to 53,526 in 2020, a 26.3 percent increase over 2010, with an estimated 58,644 by 2024.
- Right-of-way permit. LMC 12.16.010 requires a right-of-way access permit to obstruct, excavate or install facilities such as curbs, sidewalks and culverts in the city right-of-way.
- Warehouse district. About 500 acres in Hawks Prairie designated for industrial use in the 1990s became warehouses and distribution centers, including Target's 1.7 million-square-foot facility opened in 2003.

Lacey Questions
Do I need a permit to change my driveway approach in Lacey?
Work in the city right-of-way requires a right-of-way access permit under LMC 12.16.010, and the city application lists driveway approaches by number and width. We confirm the current process with the city before scheduling.
My Lacey driveway is from the 1970s. Should I overlay or replace?
It depends on the base. If there is widespread alligator cracking or soft spots, replacement usually lasts longer. On a firm base, an overlay is a fair option. We check before recommending either.
Can you repave truck areas at a warehouse?
Yes. We rebuild dock aprons and truck routes with thicker sections and can phase work so the site stays operating.
Does my HOA need to approve a new driveway?
Many Lacey HOAs have rules about driveway materials or changes in size. Check your CC&Rs or ask the HOA before the work is scheduled.
Free Estimates in Lacey, WA
Free estimates for driveways and lots in Lacey.
Asphalt Paving Near Lacey
- Asphalt Paving in Olympia, WA
- Asphalt Paving in Tumwater, WA
- Asphalt Paving in Tanglewilde, WA
- Asphalt Paving in Yelm, WA
- Asphalt Paving in Rainier, WA
- Asphalt Paving in Tenino, WA
- Asphalt Paving in Bucoda, WA
- Asphalt Paving in Rochester, WA
- Asphalt Paving in Grand Mound, WA
- Asphalt Paving in Centralia, WA
- Asphalt Paving in Chehalis, WA
- Asphalt Paving in Napavine, WA
- Asphalt Paving in Shelton, WA
- Asphalt Paving in McCleary, WA
- Asphalt Paving in Elma, WA
- Asphalt Paving in Montesano, WA
- Asphalt Paving in DuPont, WA
- Asphalt Paving in Lakewood, WA
- Asphalt Paving in Steilacoom, WA
- Asphalt Paving in University Place, WA
- Asphalt Paving in Roy, WA
- Asphalt Paving in Spanaway, WA
- Asphalt Paving in Eatonville, WA